Skip to content

SOCAR Türkiye – Jetty 2 & Jetty 3 Modernization Projects

Comprehensive HVAC Solutions for Critical Industrial Applications

As part of the modernization of SOCAR Türkiye’s industrial facilities, Gerhman contributed to the Jetty 2 and Jetty 3 Projects by supplying a comprehensive range of HVAC products and engineered solutions.

The projects were undertaken by Üstay, one of Türkiye’s leading international contractors, ranked 171st in ENR’s 2025 “Top 250 International Contractors” list. Gerhman worked closely with Üstay to meet the demanding technical, operational and safety requirements of these critical industrial facilities.

Gerhman’s scope of supply covered a broad range of HVAC equipment, including VAV units, gas-tight dampers, Ex-proof dampers, UL-certified fire dampers, electric duct heaters and air distribution equipment.

With requirements ranging from hazardous-area applications and fire safety to process ventilation and precise airflow control, the projects demanded specialized HVAC solutions. Gerhman successfully delivered an integrated HVAC product package from a single source, supporting the successful completion of the Jetty 2 and Jetty 3 projects.

Project: SOCAR Türkiye – Jetty 2 & Jetty 3
Location: Aliağa, İzmir, Türkiye
Sector: Oil & Gas / Petrochemical / Industrial
Main Contractor: Üstay
Gerhman Scope: VAV Units · Gas-Tight Dampers · Ex-Proof Dampers · UL-Certified Fire Dampers · Electric Duct Heaters · Air Distribution Equipment

Gerhman Suite
Drag the title bar to move. Use arrow keys when the title or resize handle is focused.

Keep Suite on screen

This opens a separate Suite workspace above other windows. Save your project first, then open it there. Your current in-page workspace stays open; unsaved changes are not transferred.

Close Gerhman Suite?

Unsaved work may be lost. You can minimize the window to keep it open.

fr_FRFrench