The BOTAŞ North Marmara Natural Gas Storage Project – Phase III, located in Silivri, Istanbul, was developed to significantly increase the capacity of Türkiye’s first underground natural gas storage facility.

With the completion of Phase III, the facility reached approximately 4.6 billion m³ of natural gas storage capacity and 75 million m³ of daily withdrawal capacity, making it one of Europe’s largest natural gas storage facilities and a strategically important component of Türkiye’s energy infrastructure.

Undertaken by Kalyon İnşaat, the project incorporates highly demanding requirements for fire and gas safety, airflow control and industrial ventilation.

Gerhman supplied a specialized HVAC package for the project, including CFD01 Fire & Gas Dampers, CAV-HP Constant Air Volume Units, BLUE-S Control Dampers, WBL Louvres and RHO Air Distribution Grilles.

Project Highlights

Project: BOTAŞ – North Marmara Natural Gas Storage Project, Phase III
Location: Silivri, Istanbul, Türkiye
Sector: Energy / Natural Gas / Industrial
Main Contractor: Kalyon İnşaat
Storage Capacity: 4.6 Billion m³
Daily Withdrawal Capacity: 75 Million m³
Gerhman Products: CFD01 Fire & Gas Damper · CAV-HP · BLUE-S · WBL · RHO Air Distribution Grilles

    PROJECT PRODUCTS

    Products used in this project

    Bir cevap yazın

    E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir

    Gerhman Suite
    Drag the title bar to move. Use arrow keys when the title or resize handle is focused.

    Keep Suite on screen

    This opens a separate Suite workspace above other windows. Save your project first, then open it there. Your current in-page workspace stays open; unsaved changes are not transferred.

    Close Gerhman Suite?

    Unsaved work may be lost. You can minimize the window to keep it open.

    tr_TRTurkish