{"id":1546,"date":"2026-09-12T01:13:32","date_gmt":"2026-09-12T01:13:32","guid":{"rendered":"https:\/\/gerhman.com\/?post_type=portfolio&#038;p=1546"},"modified":"2026-09-12T01:13:32","modified_gmt":"2026-09-12T01:13:32","slug":"trabzon-airport-new-superstructure-works-phase-i","status":"publish","type":"portfolio","link":"https:\/\/gerhman.com\/tr\/portfolio-item\/trabzon-airport-new-superstructure-works-phase-i\/","title":{"rendered":"Trabzon Airport \u2013 New Superstructure Works, Phase I"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Modernizing Airport Infrastructure for Increased Capacity and Operational Efficiency<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;<strong>Trabzon Airport New Superstructure Works \u2013 Phase I<\/strong>&nbsp;is a comprehensive aviation infrastructure development initiated in&nbsp;<strong>2023<\/strong>&nbsp;to modernize the airport\u2019s existing terminal and service facilities, increase passenger handling capacity and introduce new operational buildings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project is being implemented under the authority of the&nbsp;<strong>Republic of T\u00fcrkiye Ministry of Transport and Infrastructure \u2013 General Directorate of Infrastructure Investments (AYGM)<\/strong>, with construction undertaken by the&nbsp;<strong>Sera Yap\u0131 End\u00fcstrisi ve Ticaret A.\u015e. &amp; Timta\u015f Grup \u0130n\u015faat A.\u015e. Joint Venture<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scope includes the renovation of existing service facilities, construction of a&nbsp;<strong>new International Arrivals Terminal, CIP Building and Heating Center<\/strong>, as well as the modernization of the&nbsp;<strong>International Departures areas<\/strong>. The project also covers renovation works within the Domestic Departures Terminal and the addition of a&nbsp;<strong>new passenger boarding bridge<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Designed to enhance&nbsp;<strong>passenger capacity, operational efficiency and terminal infrastructure<\/strong>, the development represents an important step in bringing Trabzon Airport\u2019s facilities in line with modern aviation standards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gerhman contributed to the project with&nbsp;<strong>HVAC air distribution and airflow control solutions<\/strong>, supporting reliable ventilation, indoor environmental quality and passenger comfort across the renewed and newly constructed airport facilities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Highlights<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project:<\/strong>&nbsp;Trabzon Airport \u2013 New Superstructure Works, Phase I<br><strong>Location:<\/strong>&nbsp;Trabzon, T\u00fcrkiye<br><strong>Sector:<\/strong>&nbsp;Airport \/ Aviation Infrastructure<br><strong>Client:<\/strong>&nbsp;Ministry of Transport and Infrastructure \u2013 AYGM<br><strong>Main Contractor:<\/strong>&nbsp;Sera Yap\u0131 &amp; Timta\u015f Grup Joint Venture<br><strong>Project Scope:<\/strong>&nbsp;International Arrivals Terminal \u00b7 CIP Building \u00b7 Heating Center \u00b7 International &amp; Domestic Terminal Renovation \u00b7 Passenger Boarding Bridge<br><strong>Gerhman Scope:<\/strong>&nbsp;HVAC Air Distribution &amp; Airflow Control Solutions<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-1024x576.png\" alt=\"\" class=\"wp-image-1550\" srcset=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-1024x576.png 1024w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-300x169.png 300w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-768x432.png 768w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-1536x864.png 1536w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-18x10.png 18w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman-600x338.png 600w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/trabzon-havalimani-gerhman.png 1672w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"661\" data-id=\"1548\" src=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-1024x661.png\" alt=\"\" class=\"wp-image-1548\" srcset=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-1024x661.png 1024w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-300x194.png 300w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-768x496.png 768w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-1536x992.png 1536w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-18x12.png 18w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1-600x387.png 600w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-havalimani-gerhman-01-1.png 1561w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"748\" height=\"1024\" data-id=\"1549\" src=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-748x1024.png\" alt=\"\" class=\"wp-image-1549\" srcset=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-748x1024.png 748w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-219x300.png 219w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-768x1051.png 768w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-9x12.png 9w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar-600x821.png 600w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/Trabzon-dis-hatlar.png 1072w\" sizes=\"auto, (max-width: 748px) 100vw, 748px\" \/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>Modernizing Airport Infrastructure for Increased Capacity and Operational Efficiency The&nbsp;Trabzon Airport New Superstructure Works \u2013 Phase I&nbsp;is a comprehensive aviation infrastructure development initiated in&nbsp;2023&nbsp;to modernize the airport\u2019s existing terminal and service facilities, increase passenger handling capacity and introduce new operational buildings. The project is being implemented under the authority of the&nbsp;Republic of T\u00fcrkiye Ministry of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1549,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":[],"portfolio-types":[109],"class_list":["post-1546","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-types-references"],"_links":{"self":[{"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/portfolio\/1546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/comments?post=1546"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/media\/1549"}],"wp:attachment":[{"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/media?parent=1546"}],"wp:term":[{"taxonomy":"portfolio-types","embeddable":true,"href":"https:\/\/gerhman.com\/tr\/wp-json\/wp\/v2\/portfolio-types?post=1546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}