{"id":1505,"date":"2026-09-11T20:28:16","date_gmt":"2026-09-11T20:28:16","guid":{"rendered":"https:\/\/gerhman.com\/?post_type=portfolio&#038;p=1505"},"modified":"2026-09-11T20:28:17","modified_gmt":"2026-09-11T20:28:17","slug":"botas-north-marmara-natural-gas-storage-project-phase-iii","status":"publish","type":"portfolio","link":"https:\/\/gerhman.com\/fr\/portfolio-item\/botas-north-marmara-natural-gas-storage-project-phase-iii\/","title":{"rendered":"BOTA\u015e \u2013\u00a0North\u00a0Marmara\u00a0Natural\u00a0Gas\u00a0Storage\u00a0Project,\u00a0Phase\u00a0III"},"content":{"rendered":"<h3 class=\"wp-block-heading\">Advanced HVAC Solutions for Critical Energy Infrastructure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;<strong>BOTA\u015e North Marmara Natural Gas Storage Project \u2013 Phase III<\/strong>, located in&nbsp;<strong>Silivri, Istanbul<\/strong>, was developed to significantly increase the capacity of T\u00fcrkiye\u2019s first underground natural gas storage facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the completion of Phase III, the facility reached approximately&nbsp;<strong>4.6 billion m\u00b3 of natural gas storage capacity<\/strong>&nbsp;and&nbsp;<strong>75 million m\u00b3 of daily withdrawal capacity<\/strong>, making it one of Europe\u2019s largest natural gas storage facilities and a strategically important component of T\u00fcrkiye\u2019s energy infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Undertaken by&nbsp;<strong>Kalyon \u0130n\u015faat<\/strong>, the project incorporates highly demanding requirements for&nbsp;<strong>fire and gas safety, airflow control and industrial ventilation<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gerhman supplied a specialized HVAC package for the project, including&nbsp;<strong>CFD01 Fire &amp; Gas Dampers, CAV-HP Constant Air Volume Units, BLUE-S Control Dampers, WBL Louvres and RHO Air Distribution Grilles<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Highlights<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project:<\/strong>&nbsp;BOTA\u015e \u2013 North Marmara Natural Gas Storage Project, Phase III<br><strong>Location:<\/strong>&nbsp;Silivri, Istanbul, T\u00fcrkiye<br><strong>Sector:<\/strong>&nbsp;Energy \/ Natural Gas \/ Industrial<br><strong>Main Contractor:<\/strong>&nbsp;Kalyon \u0130n\u015faat<br><strong>Storage Capacity:<\/strong>&nbsp;4.6 Billion m\u00b3<br><strong>Daily Withdrawal Capacity:<\/strong>&nbsp;75 Million m\u00b3<br><strong>Gerhman Products:<\/strong>&nbsp;CFD01 Fire &amp; Gas Damper \u00b7 CAV-HP \u00b7 BLUE-S \u00b7 WBL \u00b7 RHO Air Distribution Grilles<\/p>\n\n\n\n<ul class=\"wp-block-list\"><\/ul>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"476\" data-id=\"1508\" src=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-1024x476.jpg\" alt=\"\" class=\"wp-image-1508\" srcset=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-1024x476.jpg 1024w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-300x140.jpg 300w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-768x357.jpg 768w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-1536x714.jpg 1536w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-18x8.jpg 18w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1-600x279.jpg 600w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/botas-silivri-1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"1510\" src=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-1024x576.jpg\" alt=\"\" class=\"wp-image-1510\" srcset=\"https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-1024x576.jpg 1024w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-300x169.jpg 300w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-768x432.jpg 768w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-18x10.jpg 18w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1-600x338.jpg 600w, https:\/\/gerhman.com\/wp-content\/uploads\/2026\/09\/silivri-dogal-gaz-depolama-a-1884502-1.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>Advanced HVAC Solutions for Critical Energy Infrastructure The&nbsp;BOTA\u015e North Marmara Natural Gas Storage Project \u2013 Phase III, located in&nbsp;Silivri, Istanbul, was developed to significantly increase the capacity of T\u00fcrkiye\u2019s first underground natural gas storage facility. With the completion of Phase III, the facility reached approximately&nbsp;4.6 billion m\u00b3 of natural gas storage capacity&nbsp;and&nbsp;75 million m\u00b3 of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1507,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":[],"portfolio-types":[109],"class_list":["post-1505","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-types-references"],"_links":{"self":[{"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/portfolio\/1505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/comments?post=1505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/media\/1507"}],"wp:attachment":[{"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/media?parent=1505"}],"wp:term":[{"taxonomy":"portfolio-types","embeddable":true,"href":"https:\/\/gerhman.com\/fr\/wp-json\/wp\/v2\/portfolio-types?post=1505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}